Main technical problems and research achievement of 12.5 m deep-water channel construction phase I of the Yangtze River below Nanjing city
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper proposes the main technical problems in the first-stage project of 12.5 m deep-water channel of the Yangtze River below Nanjing city, such as water and sediment movement characteristics and navigation-obstructing characteristics, channel regulation and the timing of key parts, waterway regulation scheme optimization, and waterway’s new regulation structures, and analyzes the solutions to these problems and achievements, which are helpful for the acknowledgement of the construction and understanding of tidal river waterway regulation technology.

    Reference
    Related
    Cited by
Get Citation

曹民雄,应翰海,钱明霞.长江南京以下12.5 m深水航道建设一期工程的主要技术问题与研究成果[J].水运工程,2012,(11):5-13

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 20,2012
  • Published:
Article QR Code