Introduction of 12.5m deep-water channel construction of the Yangtze River below Nanjing city
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reference
    Related
    Cited by
Get Citation

肖大选.长江南京以下12.5 m深水航道建设工程暨一期工程简介[J].水运工程,2012,(11):1-4

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 20,2012
  • Published:
Article QR Code