Abstract:Based on the construction practice of waterway regulation engineering of the Yangtze River,this paper researches the construction technology of mattress sinking along the current, and provides a parameter combination which is characterized by high construction efficiency and safety, and solves the problems easily occurred in the mattress sinking including improper overlapping of the sinking mattress, mattress breaking, as well as indent mattressing, etc.