Application of new structure and material in waterway regulation of the upper Yangtze River reach Yibin to Chongqing
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the characteristics of many shoal and rapids,rise and fall abruptly of the water level,ubiquity of graved bedload,it puts forword higher requirement on structure and material of regulating on mountainous river.According to the finished waterway regulation engineering of the upper Yangtze River reach of Luzhou to Chongqing and Yibin to Luzhou,this paper summarize the application of new structure and material,construction technology and so on that used and fit well in this river,obtains a number of application examples.The experience provides some reference for waterway regulation on another mountainous rivers.

    Reference
    Related
    Cited by
Get Citation

杨祥飞.长江上游宜宾—重庆河段航道整治新结构新材料应用*[J].水运工程,2012,(10):115-119

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 02,2012
  • Published:
Article QR Code