Reasons of excessive thickness of concrete slab calculated from standard in the container yard pavement under action of reach stacker
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the standard when calculating the thickness of the concrete slab, the value is 400mm in the container yard in berth No. 6 & berth No.7 of Dayaowan port area of Dalian port. But in the practical project, it was only 200 mm. The reach stacker was not allowed to work here by the original design. However, the concrete slab was not damaged after a lengthy operation of the reach stacker virtually. Different pavement designs were compared by calculations and the conclusion was that the reason why the thickness of slab was overlarge was that the modulus of resilience of earth subgrade adopted under the rigid pavement was too small.

    Reference
    Related
    Cited by
Get Citation

牛晓丹,胡 鹏.正面吊作用下混凝土板规范计算厚度过大的原因探讨[J].水运工程,2012,(9):200-202

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 20,2012
  • Published:
Article QR Code