Abstract:Based on experience of many years’ in-situ dredging management, the author presents several methods of improving dredging efficiency of cutter suction dredgers in terms of the thickness adjustment of the soil to be cut, the improvement of construction process and the proper layout of pipelines. It is proved by practice that by these methods, we can cut down the dredging cost, reduce the energy consumption and achieve good economic benefits.