Building of high-grade channel network in five rivers tail of Jiangxi province
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the analysis of the navigation channel situation in five rivers tail of Jiangxi province, this paper probes into the possibility of building the high-grade channel network due to the construction of the Poyang lake hydraulic engineering (PLHE). The hydro-dynamic numerical model of the river network is used to study the effect of navigation water level, navigation mileage and backwater area on different regulating water levels of the PLHE. For building the highgrade channel, the lowest regulating water level of the PLHE should be larger than 15 m.

    Reference
    Related
    Cited by
Get Citation

杨礼生,肖 洋,李开杰,汪迎春,张九鼎,唐洪武.构建江西五河尾闾高等级航道网的探讨*[J].水运工程,2012,(9):126-131

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 20,2012
  • Published:
Article QR Code