On wharf mooring berthing facilities in upstream of the Yangtze River
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper analyzes the shortage of traditional wharf mooring berthing facilities in upstream of the Yangtze River and proposes the berthing row pier structure based on Chongqing Naxigou wharf project. It is shown that the berthing row pier increases the bent spacing and reduces the underwater workload, thus it can solve the problem of tight operating days because of the raising of reservoir elevation and change the traditional “close-row piles” . It also solves the problem of river siltation near the wharf. The finite element analysis result on the berthing row pier shows that the berthing row piers are set reasonably and reduce the distribution loads on other bents.

    Reference
    Related
    Cited by
Get Citation

杨 洋,王多垠,翁珍燕,吴德勇.长江上游码头系靠泊设施研究*[J].水运工程,2012,(9):87-92

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 20,2012
  • Published:
Article QR Code