Channel arrangement of 12.5m deepwater channel construction phase I project of the Yangtze River downstream Nanjing, Taicang-Nanjing Section
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To support the design of 12.5m deepwater channel construction phase I project downstream Nanjing, Taicang-Nanjing section, we present an analysis of the channel arrangement of the section. Based on the construction standard, natural conditions, channel arrangement principles, navigation requirements and environment, a reasonable arrangement scheme is put forward along with detailed channel axis layout, directions and turning angles. The relationship between the arrangement and ships’ routeing system are also analyzed.

    Reference
    Related
    Cited by
Get Citation

李 黎,李 昕.长江干线南京以下12.5 m深水航道建设一期工程(太仓—南通)航道布置[J].水运工程,2012,(7):146-150

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 23,2012
  • Published:
Article QR Code