ZHU Lin1, HUANG Hong-wei2, WANG Huai-zhong3
1. CCCC Third Harbor Consultants Co., Ltd., Shanghai 200032, China; 2. Dept. of Geotechnical Engineering, Tongji University, Shanghai 200092, China; 3. Baoshan Iron & Steel Co., Ltd., Shanghai 201900, China1. CCCC Third Harbor Consultants Co., Ltd., Shanghai 200032, China; 2. Dept. of Geotechnical Engineering, Tongji University, Shanghai 200092, China; 3. Baoshan Iron & Steel Co., Ltd., Shanghai 201900, China
朱 琳,黄宏伟,王怀忠.深水大直径嵌岩钢管桩施工期风险分析[J].水运工程,2012,(2):143-147
Copy