Lock filling & emptying system arrangement for Laokou shipping hub in Guangxi Yujiang River
Author:
Affiliation:

Guangxi Communications Planning Surveying and Designing Institute, Nanning 530011, China

  • Article
  • | |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    Yujiang river is an important part of the Xijiang river golden waterway in Guangxi, and the shiplock of Laokou shipping hub is very important. The designed water head of the lock is 14.5 m, and the filling time is required to be not more than 10 min. According to emptying water system design specifications and the characteristics of this project, we choose a more compact structural arrangement as the water filling & emptying system for the lock wall’s holes. Based on the data of similar locks home and abroad, and through calculation and optimization of hydraulic model test, we determine the overall layout and key dimensions of all parts. Model test results show that the hydraulic characteristics of water filling & emptying system meet the requirement of the code, and has achieved the desired objectives.

    Reference
    Related
    Cited by
Get Citation

刘劲.广西郁江老口航运枢纽船闸输水系统布置[J].水运工程,2011,(08):94-97

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Online: January 10,2012
Article QR Code