Terrane determination during construction of rock-socketed filling pile
DOI:
CSTR:
Author:
Affiliation:

CCCC Water Transportation Consultants Co., Ltd., Beijing 100007, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In wharf construction, since the covering layer of strata is very thin due to the affection from its surrounding geologic condition, the rock-socketed filling pile has been widely applied. The judgement of the terrane’s quality of rock-socketed filling pile is the key in the design, construction and supervision. This paper expounds the judgement of the terrane’s quality during constrution of rock-socketed filling piles, and proposes countermeasures which have been applied to the real project.

    Reference
    Related
    Cited by
Get Citation

余敏.嵌岩灌注桩的岩层确定[J].水运工程,2011,(06):164-166

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 23,2012
  • Published:
Article QR Code