    Abstract:

    The ship mooring force acting on the mooring dolphin of open crude oil terminal is one of the key design parameters of the structure. To counter the inconsistency of the selection principles adopted in different projects of the water transport industry, we propose to consider comprehensively factors including the calculated mooring force, strength design of the releasing hook, terminal safety conditions, and the impact on the structure,etc. We also illustrate the importance of a careful analysis and selection of the mooring force acting on the structure by analyzing the engineering case.

    Reference
    Related
    Cited by
Get Citation

陈际丰,林乐伟,章少兰.作用于开敞墩式原油码头结构船舶系缆力的选取[J].水运工程,2011,(06):73-76

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 23,2012
  • Published:
Article QR Code