Key technology for pier construction of dock project
DOI:
CSTR:
Author:
Affiliation:

1. Shanhaiguan Shipbuilding Heavy Industry Co., Ltd., Qinhuangdao 066206, China;2. No.5 Engineering Company Ltd. of CCCC-First Harbor Engineering Company Ltd., Qinhuangdao 066000, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The shipbuilding dock project in the western zone by Shanhaiguan Shipbuilding Industrial Co.,Ltd. has such features as complicated structures, large work quantity and tight work schedules, etc.Therefore, a series of key control measures are taken during the pier construction of the ship dock, including reasonable division of blocks and lifts, control of concrete construction time and interval of structural lift division, formwork technique of reducing lateral structural constraint, heating radiating hole provision and block stone embedment in the dock pier concrete, concrete curing and temperature-measuring control, etc., which achieved the effects of no seepage, no leakage and no cracking of the whole dock, and a good apparent quality of concrete as well.

    Reference
    Related
    Cited by
Get Citation

王志强,历智,胡克飞,杨建辉, 李泽弘,仇潇潇.船坞工程中坞墩施工关键技术[J].水运工程,2011,(03):168-172

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 31,2012
  • Published:
Article QR Code