Treatment of underwater rubble-mound foundation in Caofeidian by explosive compaction
DOI:
CSTR:
Author:
Affiliation:

1. Tangshan Caofeidian Port Co., Ltd., Tangshan 063200, China;2. CCCC Water Transportation Consultants Co.,Ltd., Beijing 100007, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Tangshan port Caofeidian multi-purpose wharf is the first caisson-type gravity wharf adopted in Caifeidian port area. The paper gives an application example on the use of explosive compaction method to deal with underwater ripped-rock bed-ground in Caofeidian multi-purpose wharf engineering. It also summarizes the construction method, application effect, treatment of problems, as well as matters of attention for the explosive compaction technology. Furthermore, the paper gives a technical and economic comparison between the traditional hammer ramming and this new method, so it has accumulated experience for the application of this method in similar projects in Caofeidian.

    Reference
    Related
    Cited by
Get Citation

解占强,张金柱,李小民,邵昌浩.爆夯法处理水下抛石基床在曹妃甸的应用[J].水运工程,2011,(03):154-158

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 31,2012
  • Published:
Article QR Code