Analysis and calculations on effect of the navigation dredging project in Zhenxiang and Longxuenan waterway on Yamen estuarine reach
DOI:
CSTR:
Author:
Affiliation:

State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering,Hohai University, Nanjing 210098, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The seaward waterway of Jiaomen includes Zhenxiang and Longxuenan waterway. Channel dredging is the main method of the navigation training project. Based on analysis of river evolution and the 2D estuarial suspended sedimentation numerical model with the nested grids, the effects of the dredging project in Zhenxiang and Longxuenan waterway on flow dynamics and sediment transportation in Yamen estuary are studied.Main conclusions are as follows: 1) The river evolution of Zhenxiang and Longxuenan waterway is relatively steady.2) After implementation of the dredging project in Zhenxiang and Longxuenan waterway, the change of flow dynamics and sediment transportation in Yamen estuary is very small. The main changes take place vicinity of navigation channel with dredging project and its beach. 3) Due to the small amount of dredging works, there is little influence on the water-sediment condition in the seagoing area of Jiaomen eastuary.

    Reference
    Related
    Cited by
Get Citation

肖洋,陈界仁,刘国珍.枕箱、龙穴南水道航道疏浚工程对蕉门出海水域影响的计算分析*[J].水运工程,2011,(03):111-116

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 31,2012
  • Published:
Article QR Code