Abstract:After the 175 m water storage operation of the Three Gorges project,the scale of Jiulongpo to Chaotianmen reach cannot meet planning requirements.During the sedimentation period,the sediment is washed up and down,and the erosion is not timely,causing shallow navigation obstruction in the channel.The channel regulation of this reach is carried out from 2016 to 2020 to improve the channel scale of the engineering reach and curb the adverse development of channel conditions.After the completion of the project,the improvement effect is analyzed through regular observation.The results show that the river regime in the engineering reach is stable,the scale of the channel is significantly improved,and the unfavorable development trend is curbed,resulting in effective improvement of the channel conditions,achieving the goal of channel regulation.