Abstract:In response to the comprehensive characteristics of multiple branching and large flow of the Heishazhou waterway,as well as the complex flow of the tidal river section in the lower reaches of the Yangtze River,the hydrological observation data are analyzed and summarized.Combined with the on-site practical work of the second phase of waterway regulation project construction,in-depth research is conducted on surface velocity and flow direction measurement,gradient observation,hydrological section measurement,etc.in hydrological observation.Modern new equipment and technology are used to optimize the layout of hydrological sections and water gauge positions,efficiently organize and implement,improve work efficiency,and obtain complete and detailed hydrological observation data.This method effectively solves the problems existing in the hydrological observation of the tidal reach of the lower reaches of the Yangtze River,and provides reliable basic data for the project design,construction and related thematic research.The research results can provide reference for similar projects.