Container terminal located in developing country or region,where power grid cannot fulfill the terminal power consumption,usually rely on a diesel-based power generation.The ship to shore crane operation character is a frequent fluctuated load.In some extreme condition,the operation of diesel gen-set faces a challenge because of a large inverse power feedback to the power supply system.According to the condition of the project supported,we compare different energy storage technologies,propose a recommendation that using high-speed fly wheel system and battery energy storage system(BESS) to develop a micro-grid improvement retrofit scheme to mitigate the fluctuations from the load side.We also propose suggestions on micro-grid control strategy study,interfaces for renewable power connections and interfaces between other micro-grid and distribution grid,so as to develop a modular,standardized and intelligent micro-grid configuration scheme for container terminals.