Optimization of cutter suction dredger construction process for dredging project of general berths 27#~29# in Longkou Port Area of Yantai Port
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    烟台港龙口港区27#~29#通用泊位疏浚工程土质主要为起球的黏性土,混有少量粗砂,绞吸船在施工时受黏土起球及黏性等影响,容易出现堵管、绞刀糊堵、输送困难等情况,施工作业关键参数波动幅度较大,作业人员操作控制难度高,平均生产效率低。重点围绕绞吸船的挖掘和输送分析,确定关键施工参数,优化施工工艺,指导作业人员施工。优化后的施工工艺使烟台港龙口港区27#~29#通用泊位疏浚工程绞吸船施工产能提高20%以上,节约了施工成本。

    Abstract:

    The soil quality of the dredging project for the 27 #~29# general berths in the Longkou Port Area of Yantai Port is mainly composed of cohesive soil mixed with a small amount of coarse sand.During the construction of this soil quality,the cutter suction dredger is affected by clay pilling and viscosity,which can easily lead to pipe blockage,cutter sticking,and transportation difficulties.The fluctuation of key parameters in the construction operation is large,and the operators control are difficult,resulting in low average production efficiency.This article focuses on the excavation and transportation analysis of cutter suction dredger,determining key construction parameters,optimizing construction processes,and guiding operators in construction.The optimized construction process has increased the construction capacity of the cutter suction dredger for the general berths 27#~29# in the Longkou Port Area of Yantai Port by more than 20%,saving construction costs.

    参考文献
    相似文献
    引证文献
引用本文

张亚楠,刘 昊.烟台港龙口港区27#~29#通用泊位疏浚工程绞吸船施工工艺优化[J].水运工程,2024(1):226-229.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2024-01-09
  • 出版日期:
文章二维码