    摘要:

    葛洲坝下游原钢板桩纵向围堰为临时设施,现已超期服役。通过研究钢板桩围堰对1号船闸通航安全的影响,为钢板桩围堰拆除或重建提供依据。建立葛洲坝下游河道二维水动力模型,对入库流量为1号船闸最大通航流量35 000 m3/s时钢板桩围堰拆除和重建工况进行数值模拟计算。结果表明大江、二江分流比小于0.9且越小时,拆除钢板桩围堰对1号船闸下游口门区通航水流条件影响越大。

    Abstract:

    The original steel sheet pile longitudinal cofferdam downstream of Gezhouba is a temporary facility and has now exceeded its service period.This paper studies the impact of steel sheet pile cofferdam on the navigation safety of the ship lock No.1,providing a basis for the demolition or reconstruction of steel sheet pile cofferdam.A two-dimensional hydrodynamic model is established for the downstream channel of Gezhouba Dam,and numerical simulation calculations are conducted for the demolition and reconstruction of steel sheet pile cofferdams under the maximum navigable flow of 35,000 m3/s at the Ship lock No.1.The calculation results show that when the diversion ratio of the two rivers is less than 0.9 and the smaller,the demolition of the steel sheet pile cofferdam has a greater impact on the navigation flow conditions in the downstream entrance area of the ship lock No.1.

    参考文献
    相似文献
    引证文献
引用本文

曾 辉,刘振嘉,喻 峰,等.拆除葛洲坝钢板桩纵向围堰对1号船闸通航安全影响[J].水运工程,2023(12):124-131.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-12-13
  • 出版日期:
文章二维码