Abstract:In view of the problems of poor precision control and difficult quality assurance in the joint construction of reinforced concrete shelving structure and auxiliary equipment,the standardization of construction technology and the key points of construction quality control of reinforced concrete shelving structure are studied based on the reinforced concrete shelving structure project in the spillway gate opening and closing room of Longxikou navigation and power hub project.The methods of optimizing construction organization and construction technology are adopted to put forward the optimization measures of construction period and quality,and make it clear that the erection of bracket and template assembly are the main control points in the construction process of shelving structure,it provides reference for the application of shelving structure in similar navigation and power hub projects.