龙溪口航电枢纽右岸接头坝方案比选
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Scheme comparison of right bank joint dam of Longxikou Navigation-power Junction
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    施工设计优化在船闸施工设计中的运用越来越广泛,以龙溪口项目右岸接头坝为例,综合考虑工程边界条件,提出右岸接头坝3种实施方案比选。从工程质量风险、施工工期和施工成本等方面进行比选,同时考虑右岸接头坝工期紧张、基础处理难度大等特点,选择最佳实施方案。在实施运用中,针对右岸接头坝建设中的重难点,采取了一系列优化技术与措施,保证工期的同时将成本降至预期效果。

    Abstract:

    Construction design optimization is more and more widely used in the construction design of ship locks.Taking the right bank joint dam of Longxikou project as an example,considering the engineering boundary conditions comprehensively,three kinds of implementation schemes for the right bank joint dam are proposed.The best implementation plan is selected from the aspects of project quality risk,construction period and construction cost,and the characteristics of tight construction period and difficult foundation treatment of the right bank joint dam are considered.In the implementation and application,a series of optimization techniques and measures have been taken to ensure the construction period and reduce the cost to the expected effect in view of the difficulties in the construction of the right bank joint dam.

    参考文献
    相似文献
    引证文献
引用本文

曾和余,符业晓,吕 科.龙溪口航电枢纽右岸接头坝方案比选[J].水运工程,2023(10):47-51.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-10-16
  • 出版日期:
文章二维码