Technical scheme of shore power access to anchorage in Three Gorges Dam area
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    三峡坝区锚地数量多、水域地形复杂、船舶靠泊形式多样,给岸电的技术推广和应用带来困难。本文从基础设施的角度,通过对三峡坝区锚地和待闸船舶调研、分析,结合三峡坝区常见的趸船、直立式靠船墩、丁靠、抛锚4种船舶靠泊方式,研究三峡坝区岸电接入锚地的方式和布置形式,提出了可行的锚地差异化岸电接入方案,为锚地岸电建设提供思路和技术支撑。不仅解决了三峡库区船舶污染问题,而且对水上绿色服务区建设和推进长江经济带绿色航运发展具有重要意义。

    Abstract:

    The large number of anchorage,complex water topography and various types of ship berthing in the Three Gorges Dam area have brought difficulties to the popularization and application of shore power technology.From the point of view of infrastructure,this paper conducts research and analysis on the anchorage and ships waiting for lock in the Three Gorges Dam area,combining with the four common ship berthing modes in the three Gorges Dam area:barge,vertical pier,Ding berthing and anchoring.The mode and layout of shore power access to anchorage in the Three Gorges Dam area are studied,and a feasible differential anchorage access scheme is put forward,providing ideas and technical support for anchorage shore power construction.It can not only solve the problem of ship pollution in the Three Gorges Reservoir area,but also is of great significance for the construction of water green service area and promoting the development of green shipping in the Yangtze River Economic Belt.

    参考文献
    相似文献
    引证文献
引用本文

刘 浩,王 俊.三峡坝区锚地岸电接入技术方案[J].水运工程,2023(6):81-84.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-06-13
  • 出版日期:
文章二维码