装配式高桩码头插槽式横梁安装工艺*
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

国家重点研发计划项目(2021YFB2600700)


Installation process for slot-type beams of prefabricated high-piled wharf
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    插槽式横梁为一种内置空腔的新型结构, 在安装时不同于高桩码头纵梁等上部预制构件, 其无下部构件作为支撑面, 且需要将桩基套入构件内置空腔内, 施工未有先例, 安装难度大。针对插槽式构件的安装工艺, 开发了构件安装操作平台、集成精确定位装置等, 并研究不同形式起重船的安装方法。通过国内首个全装配式高桩码头上实践应用, 取得良好的效果, 可为类似工程提供参考。

    Abstract:

    Slot-type beam is a new structure with built-in cavities, and it is different from the upper prefabricated components such as the longitudinal beam of the high-piled wharf in terms of installation.In addition, it has no lower component to serve as the bearing surface and requires the pile foundation to be inserted into built-in cavities of the component.The slot-type beam has not been used in projects, and its installation is difficult.In view of the installation process of slot-type components, this paper develops a component installation operation platform and an integrated precise positioning device and studies the installation methods of different crane ships.In addition, the practical application of the first fully prefabricated high-piled wharf in China achieves excellent results and can provide a reference for similar projects.

    参考文献
    相似文献
    引证文献
引用本文

刘 鹏,周厚亚,刘晓曦.装配式高桩码头插槽式横梁安装工艺*[J].水运工程,2023(5):147-152.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-05-10
  • 出版日期:
文章二维码