General layout and engineering application of fully prefabricated high-piled wharf
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对传统高桩码头装配率及标准化程度低, 存在现场和水上混凝土浇筑工作量大, 船机和施工人员配置多, 作业面狭小, 安全风险高等问题, 通过大量的理论和实验研究, 提出了以大构件、高装配率为总体设计理念的全装配式高桩码头, 并成功应用于连云港某码头。本文以全装配式高桩码头为例, 类比传统高桩码头, 介绍平面布置的总体设计方案。结果表明:全装配式高桩码头采用模块化装配方式, 遵循标准化、大构件、少节点的原则, 具有显著的工期短、效率高、经济节约、绿色低碳等特点。

    Abstract:

    Traditional high-piled wharfs confronts many problems, such as a low prefabricated rate, low standardization, large on-site and aquatic concrete pouring workload, many ship engines and construction personnel, narrow working face, and high safety risks.Considering these problems, this study proposes a fully prefabricated high-piled wharf following the overall design concept of large members and a high prefabricated rate through massive theoretical research and tests and successfully applies it to a wharf in the Port of Lianyungang.Taking the fully assembled high-piled wharf as an example, this paper introduces the general design scheme of the plane layout by analogy with the traditional high-piled wharf.The results show that the fully prefabricated high-piled wharf adopts the modular prefabricated mode and follows the principle of standardization, large members, and few nodes, featuring a short construction period, high efficiency, good economy, and low carbon emissions.

    参考文献
    相似文献
    引证文献
引用本文

郭兆珈,盛佳珺,杭建忠,等.某全装配式高桩码头平面布置及工程应用[J].水运工程,2023(5):65-70.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-05-10
  • 出版日期:
文章二维码