Abstract:In view of the relative shortage of water resources in the northern region,combined with the Wangdao ship lock project in the Xiaoqing River,the water-saving measures of the ship lock are discussed,and two different plane layout schemes and operation modes of multi-stage water-saving pools with deep and shallow pools and different water deliveries are put forward,namely,single-stage water-saving pools operating alone and single-stage water-saving pools combined with pumping station operation. The following conclusions are drawn from the comparative analysis:1)Both of two water-saving schemes meet the requirements of the specification and water-saving use.2)The multi-stage water-saving tank has a high water saving rate,and the single-stage water-saving tank combined with the pump station has a long water delivery time. 3)The selection of water-saving schemes for similar projects needs to be comprehensively determined in combination with water resource conditions,ship lock throughput capacity requirements,water delivery time,site layout,construction conditions,and project investment.