大型沉箱钢筋分段预制装配安装技术
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Assembly and installation technology of prefabricated reinforcement sections for large caisson
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对传统重力式沉箱预制钢筋绑扎安装工艺存在的问题,创新了一种大型沉箱分段预制钢筋装配安装技术,有效减少起重设备吊装次数、提高钢筋保护层厚度的合格率、消除高空穿筋作业安全风险。该安装技术成功应用于钦州港大榄坪9#、10#泊位工程,促使沉箱预制向机械化、智能化、装配化方向发展。应用效果显示沉箱分段预制钢筋装配安装技术在质量、安全、功效及效益等方面优势明显。

    Abstract:

    In view of the problems existing in the reinforcement binding and installation process while prefabricating traditional gravity caissons,this study innovates a new assembly and installation technology of prefabricated reinforcement sections for a large caisson. The technology can effectively reduce the hoisting times of lifting equipment,improve the qualification rate of the protective layer thickness of reinforcement,and eliminate the safety risk of reinforcement insertion in the air. The installation technology has been successfully applied to Berths No. 9 and 10 in Dalanping of Qinzhou Port,promoting the development of caisson prefabrication toward mechanization,intelligence,and assembly. The application results reveal that the assembly and installation technology of prefabricated reinforcement sections for caissons has great advantages in quality,safety,efficiency,and benefits.

    参考文献
    相似文献
    引证文献
引用本文

骆千珺,任旭龙.大型沉箱钢筋分段预制装配安装技术[J].水运工程,2022(10):129-132.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2022-10-09
  • 出版日期:
文章二维码