Due to the proposal of the Belt and Road Initiative,project construction is now faced with the confusion caused by the different standards of different countries. As the manufacturing process determines the mechanical properties of the pile foundation components,understanding the manufacturing processes of different national standards is an important basis for reasonable design. This paper discusses the Chinese code for wharf construction,the American code for concrete cylinder piles,and relevant codes in the European standard to reflect some differences in the manufacturing processes of prestressed concrete pipe piles. The main results are as follows:1)As for the pre-tensioning method,the Chinese code prefers the centrifugal casting process,while the American code uses a centrifugal or static pressure grouting process. In terms of the post-tensioning method,the Chinese code specifies a composite or centrifugal process,whereas the American code opts for a centrifugal casting process and the European code does not provide specific provisions. 2)The Chinese code offers more detailed regulations on the processes of steel bar processing,tensioning,grouting,and prestressed manufacturing. In contrast,the American and European codes are universal and generally require that a large number of other codes or manuals be looked up. The comparison results can provide a reference for Chinese construction enterprises to participate in foreign wharf projects.