Construction optimization of super long spacing of cutter suction dredger in series with relay pump ship
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对南通港小庙洪上延航道工程一阶段施工项目的超长排距工况条件,通过对船舶和管线的泥浆扬程、输送阻力损失等水力特性进行分析,验证“新海鲛”与“航绞接1号”采用“2泵+2泵”串联施工工艺能保证此次超长排距施工需求,并推导“航绞接1号”的最佳施工位置,解决绞吸船多级泥泵串联后局部排出压力过高的问题,并将工艺测算结果和优化措施应用于工程实际。结果表明,优化后提高了船组的时间利用率和生产率,取得了较好的施工效果。

    Abstract:

    According to the working condition of super long spacing in the first stage construction project of Xiaomiaohong waterway extension project in Nantong Port,we analyze the the hydraulic characteristics of the ship and pipeline,such as the pressure head of mud pump,transmission resistance loss and etc,verify that the “2 pumps + 2 pumps” series construction technology adopted by the “Xinhaijiao” and “Hangjiaojie No.1” can ensure the construction demand of the super long spacing,and deduce the optimal construction position of “Hangjiaojie No.1”,which can solve the problem that the local discharge pressure is too high after the multi-stage mud pump series connection. We apply the results of process calculation and optimization measures to the follow-up engineering practice. The results show that the optimization improves the hourly interest rate and production rate of ship group,and achieves good construction effect.

    参考文献
    相似文献
    引证文献
引用本文

费子豪,吕 鑫,李权真.绞吸船串联接力泵船超长排距施工优化[J].水运工程,2022(4):191-196.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2022-04-07
  • 出版日期:
文章二维码