    摘要:

    某港口工程监测资料揭示防渗墙墙下存在渗透通道,采用墙下灌浆措施成功治理了渗漏通道。对本工程防渗墙墙下堵漏处理的设计及施工关键技术要点进行总结,囊括防渗标准、堵漏范围确定、灌浆孔平面布置、灌浆深度、灌浆分段、灌浆压力、灌浆工艺等方面,形成一套完整的防渗墙墙下堵漏处理技术。采用水位观测确定堵漏范围的方法突破了旧有技术,可为后续项目提供参考。

    Abstract:

    In a port engineering project,monitoring data reveal the presence of leakage channels under the cut-off wall. Grouting under the wall has been proven highly effective against the leakage.The key technical points are summarized regarding the design and construction for the leakage treatment under the cut-off wall in the project,encompassing the anti-leakage standard,determination of the sealing range,layout of grouting holes,grouting depth,grouting sections,grouting pressure,and grouting technology.Taken together,they form a set of technology for the treatment of leakage under cut-off walls.The sealing range determination based on water level observation breaks through the traditional technology,which can provide a reference for subsequent projects.

    参考文献
    相似文献
    引证文献
引用本文

伍琪琳,燕继宇,王征亮.港口工程防渗墙墙下堵漏处理[J].水运工程,2022(2):224-228.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2022-02-16
  • 出版日期:
文章二维码