    摘要:

    针对犍为航电枢纽一期一段土石围堰汛期挡水问题,为确保土石围堰为汛期施工提供无水施工条件,在保证工程施工质量、安全的前提下,进行一期一段土石围堰高压旋喷桩防渗板的研究,通过施工过程中采用的高压旋喷桩防渗板墙双重管法的施工工艺、试验与分析,确定施工工艺及最佳施工参数,并对土石围堰高压旋喷桩防渗施工优势进行总结分析,为同类工程提供借鉴。

    Abstract:

    To ensure the ability of retaining water and anti-seepage of earth-rock cofferdam and the construction quality and safety of the project,we adopt the high-pressure rotary jet grouting anti-seepage slab wall in the first section of the earth-rock cofferdam of Qianwei navigation-power junction project in the Minjiang River. According to the research,test and analysis on the construction technology of the double pipe method of the high-pressure jet grouting pile anti-seepage sheet wall,we determine the construction technology and optimal construction parameters. Furthermore,we analyze the advantages of the high-pressure jet grouting pile anti-seepage construction in the earth-rock cofferdam to provide reference for similar projects.

    参考文献
    相似文献
    引证文献
引用本文

陈 浩.土石围堰高压旋喷桩防渗施工技术应用[J].水运工程,2021(12):112-114.