Scheme comparison and implementation of Minjiang Qianwei navigation-power junction phase III cofferdam
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对钢板桩和土石围堰在特定环境和条件下的适用性问题,结合工程边界条件,进行围堰方案适用性、材料来源的便利性、工程质量风险、施工工期及施工成本的研究,采用对比的方法,得出在工期紧、质量要求高、上游水头差大的工况下,土石围堰具有防渗效果更佳、成本更低的特点,更适合岷江犍为航电枢纽三期围堰工程的结论,并在研究和实践的基础上提出土石围堰施工的重点、难点及可采取的技术措施和成效,对类似工程具有借鉴意义。

    Abstract:

    Aiming at the applicability of steel sheet pile cofferdam and earth rock cofferdam in specific environment and conditions,combined with the engineering boundary conditions,we study the applicability of cofferdam scheme,convenience of material source,engineering quality risk,construction period and construction cost. Based on comparison,we come to the conclusion that under the working conditions of tight construction period,high quality requirements and large upstream water head difference,the earth rock cofferdam has the advantages of better anti-seepage effect and lower cost,and is more suitable for the phase III cofferdam project of Qianwei navigation-power junction in Minjiang River. Based on the research and engineering practice,the key and difficult points of earth rock cofferdam construction and the technical measures and results are put forward,which may serve as reference for similar projects.

    参考文献
    相似文献
    引证文献
引用本文

符业晓,陈 浩.岷江犍为航电枢纽三期围堰方案比选及实施[J].水运工程,2021(12):54-59.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-12-06
  • 出版日期:
文章二维码