Application of post-grouting cast-in-place pile in offshore batholith wharf project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对在外海无掩护孤立墩施工环境条件下岩基上采用灌注斜桩存在泥浆护壁的泥皮和孔底残余沉渣降低桩基承载力、孔壁浸泡软化降低桩周土层土体强度、混凝土芯柱过长质量难以保证、硬质岩层钻孔成孔难度大、成孔工期长等技术难点,进行减小桩基入岩深度和提高桩基承载力的研究。采用灌注桩施工后进行桩底后注浆技术,对桩底沉渣和岩基裂隙进行注浆密实,并对后注浆桩基进行检测。结果表明,后注浆能提高桩基承载力,有效减小桩基入岩芯柱长度,从而保证混凝土芯柱质量,缩短施工工期。

    Abstract:

    For constructing the cast-in-place batter pile on batholith under the offshore construction conditions of without cover and isolated pier,several technology difficulties exist,such as mud counterfort and bottom sediment reducing pile bearing capacity,soak softening of hole wall lowering the soil strength,hard to ensure quality of long concrete core column,difficult to drill hole on batholith and long hole forming period. In terms of these construction difficulties,we carry out research on reducing the depth of pile into rock and improving the bearing capacity of pile foundation. We apply the post-grouting measure after the cast-in-place pile construction,compact sinking slag and batholith fissure,and test the post-grouting pile foundation. The results show that the post-grouting measure increases pile bearing capacity,reduces the depth of pile into rock,guarantees concrete core quality and decreases the construction period.

    参考文献
    相似文献
    引证文献
引用本文

任志杰,梁 超.后注浆灌注桩在外海岩基码头工程中的应用[J].水运工程,2021(10):370-375.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-10-12
  • 出版日期:
文章二维码