    摘要:

    针对离岸码头混凝土浇筑水上施工存在施工难度大、受天气和海况影响大、施工进度及成本难以控制等难点,某30万吨级原油码头工程通过使用小型特制设备、混凝土地泵、混凝土泵车及多功能船等船机设备,实现一系列水陆结合的水上混凝土浇筑工艺的组合,并将部分混凝土浇筑由传统的水上船机作业转为陆上作业,提高施工效率,降低施工难度,节约施工成本,并保证了施工安全和工程质量。

    Abstract:

    In view of the difficulties in construction,weather and sea conditions,as well as construction progress and cost control during concrete pouring on water for the offshore terminal,we use small special equipment,concrete pumps,concrete pump trucks and multi-functional boats to realize a series of water and land combination of water concrete pouring process,and transfer part of the concrete pouring from traditional water boat operation to land operation in a 300,000-ton crude oil terminal project to improve the construction efficiency,reduce construction difficulties,save construction costs,and meanwhile ensure construction safety and project quality.

    参考文献
    相似文献
    引证文献
引用本文

汤凤春,赵洪力.离岸式高桩码头混凝土浇筑工艺[J].水运工程,2021(10):245-247.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-10-12
  • 出版日期:
文章二维码