大连港太平湾港区总体布置调整
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Adjustment of overall layout of Taipingwan port area, Dalian Port
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对大连港太平湾港区总体布置调整问题,根据宏观环境改变和新时期发展要求,采用定性、定量分析和比较研究法对总体布置方案进行优化调整。得出总面积、用海面积、占用自然岸线、泊位数减少,能力、绿化率提高、码头岸线增加的港区总体布置方案,使之对生态环境的影响显著减低,码头专业化程度得到提高。

    Abstract:

    In view of the adjustment of the general layout of Taipingwan port area of Dalian Port,we optimize the scheme by qualitative and quantitative analysis and comparative study method according to the macro environment change and the development requirements in the new period. The total area,sea area,occupied natural shoreline,and number of berths are reduced,while the capacity,greening rate,and the wharf shoreline are increased,which significantly reduces the impact on the ecological environment and improves the degree of wharf specialization.

    参考文献
    相似文献
    引证文献
引用本文

崔 柳,杜木子,陈云飞.大连港太平湾港区总体布置调整[J].水运工程,2021(7):76-79.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-07-07
  • 出版日期:
文章二维码