工程建设资料缺失的在役高桩码头结构检测评估
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Structural detection and evaluation of in-service high-piled wharf without engineering construction data
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对工程建设资料缺失的在役高桩码头结构检测评估问题,结合工程实例,采用常规检测项目和基桩完整性检测与结构荷载试验等非常规检测项目相结合的方法,查明码头结构现状性能和评定码头结构安全等级,从而达到检测评估的目的。结果表明,常规检测项目和非常规检测项目相结合的方法在在役高桩码头结构检测评估中的应用取得良好效果。建议在高桩码头交工检测、竣工检测和定期检测中增加结构静力荷载试验,并对在役高桩码头进行基桩完整性核查。

    Abstract:

    Aiming at the problem of structural detection and evaluation of the in-service high-piled wharf without engineering construction data,we combine with the engineering examples,use the method of combining the routine test items with the non-routine test items such as the integrity test of foundation piles and the structural load test to find out the current structural performance of wharf and assess the structural safety grade of the wharf,and achieve the purpose of the detection and evaluation. The results show that the combination of routine and non-routine inspection items can achieve the good results in the structural detection and evaluation of the in-service high-piled wharf. It is suggested that the static load test should be added in the construction detection,completion detection,and regular detection of the high-piled wharf,and the integrity of foundation piles should be checked for the in-service high-piled wharf.

    参考文献
    相似文献
    引证文献
引用本文

廖德华,潘新恩,张建球,等.工程建设资料缺失的在役高桩码头结构检测评估[J].水运工程,2021(7):53-59.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-07-07
  • 出版日期:
文章二维码