Wharf design considering both multi-purpose wharf and mast crane
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    鱼山码头既有集装箱出运功能,又要提供后方绿色石化基地建设期间的砂石料、钢材及大件等运输服务功能。针对这一特点,提出将多用途泊位和大件码头一体化建设。通过合理的平面布置以及桅杆吊分段采取纵向梁板与墩式结合的码头结构,确保工程质量和安全,加快了施工进度,实施效果良好。

    Abstract:

    The Yushan wharf not only has the function of container transportation but also provides transportation services such as sand,steel,and heavy cargo during the construction of the rear green petrochemical base. For this characteristic,it is proposed to integrate the construction of the multi-purpose wharf and heavy cargo wharf. Due to the rational layout of the wharf,and adopting the structure of the combination of longitudinal beam slab and pier adopted in the section of mast crane,the construction quality and safety are ensured,and the construction progress is speeded up.The implementation effect is quite satisfactory.

    参考文献
    相似文献
    引证文献
引用本文

叶小红.兼顾多用途泊位和重件桅杆吊的码头工程设计[J].水运工程,2021(5):133-139.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-05-12
  • 出版日期:
文章二维码