Abstract:Aiming at the fire protection design issues of the first phase reconstruction project and the second phase of the Zhejiang petroleum chemical liquid bulk terminal,the existing fire protection facilities of the terminal are compared with the relevant regulations of JTS 158—2019 Code for fire protection design of oil and gas chemical terminals. Contradictions between the fire protection design of the Zhejiang petroleum chemical first phase project and the current fire protection codes are obtained,and what needs to be improved is pointed out. In the future,improvements can be made in the fire protection design of the first phase reconstruction project and the second phase.