鱼山作业区规划调整方法与对策
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Method and countermeasure of planning adjustment of Yushan operation area
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对舟山绿色石化基地最新的产业规划和总体布局,开展了鱼山作业区规划调整的工作。通过分析鱼山作业区规划实施的效果,进行运输需求分析和设计船型预测,提出规划调整的范围和重点,并总结出规划调整的原则,包括根据液体化工船小型化特点合理布置泊位;专业化集装箱码头可以有效提供码头装卸效率,节省岸线资源;根据泊位等级合理布置码头形式。结果表明,调整后的规划方案能够节省工程投资,提高装卸效率,节约港口岸线资源。

    Abstract:

    According to the latest industrial planning and overall layout of Zhoushan Green Petrochemical Base,we carry out the planning adjustment of the Yushan Port. Through analyzing the effect of the implementation of the Yushan Port planning,we carry out the analysis of the transport demand and the prediction of the design ship type,propose the scope and the key points of the planning adjustment,and summarize the principles of the planning adjustment. The principles concluded are as follows:according to the miniaturization characteristics of a chemical tanker,a rational arrangement of the berth is carried out;specialized container terminals can effectively provide loading and unloading and save coastline resources;the dock form reasonably can be arranged according to berth grade demonstration. The results show that the adjusted planning scheme can save the engineering investment,improve the loading and unloading efficiency,and save the resource of the port shoreline.

    参考文献
    相似文献
    引证文献
引用本文

沈 瑜,荆 雷,郭源媛.鱼山作业区规划调整方法与对策[J].水运工程,2021(5):97-101.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-05-12
  • 出版日期:
文章二维码