    摘要:

    水电站配套码头的设计常面临地形和地质复杂、布置空间受限、装卸作业水位落差较大等限制条件。针对复杂条件下水电站配套码头设计面临的问题,以西部地区某水电站上游配套码头为例,研究码头总体方案布置的关键问题。基于库区码头的功能定位,提出多方案选址、基于功能的码头分区、控制开挖量、合理的对外交通等有关解决措施,讨论基于趸船的集运鱼和清污船装卸工艺方案。结果可为类似工程提供借鉴。

    Abstract:

    The design of supporting terminals for hydropower stations often faces constraints such as complex terrain and geology,limited layout space,and large change in water level for loading and unloading operations. In view of the problems faced by the design of the supporting terminals of hydropower stations under complex conditions,taking the upstream supporting terminals of a hydropower station in the western region as an example,we probe into key issues concerning the overall plan layout of the terminals. Based on the functional positioning of the terminals in the reservoir area,we propose related solutions such as multi-site selection,function-based terminal zoning,control the amount of excavation works,and reasonable external traffic,and discuss the loading and unloading process schemes of barge-based fish collection and sewage ship.The result may serve as reference for similar projects.

    参考文献
    相似文献
    引证文献
引用本文

朱本飞,叶成华.水电站上游配套码头总体方案设计[J].水运工程,2021(1):87-91.