Considering the characteristics of the built breakwater around the filling zone 6 of Kuantan New Deepwater Port,Malaysia,which is connected to the shore and backfilling sand is easy to accumulate and not easy to loss,we adopt the method of non-cofferdam reclamation by setting silt curtain,which satisfies the environmental requirements of the locality. The results show that non-cofferdam reclamation method is feasible in specific environment,which can control the loss rate,shorten the construction period,meet the requirements of environmental protection,avoid the risk of overseas construction to a certain extent,improve the economic benefit,and be referred for similar projects.