Application of BIM technology in Yangshan Phase IV wharf project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对高桩码头施工过程中存在工程体量大、施工难度高和较大工程误差等问题,进行BIM技术应用于水工码头施工的研究。将BIM技术应用于工程施工可视化、碰撞检查、工程量计算和施工组织设计等方面,在高桩码头工程施工质量、进度、成本控制等方面取得显著的效果,为BIM技术在高桩码头水工领域的实践应用提供参考。

    Abstract:

    Aiming at the problems of large project volume,difficult construction and large engineering error during construction of high-piled wharf,this paper carries out a research on the application of BIM technology to the construction of hydraulic docks. The application of BIM technology to the construction visualization,collision inspection,engineering quantity calculation,and construction organization design achieves remarkable effect in the construction quality,schedule and cost control of the high-piled wharf project. It may serve as reference for the practical application of BIM technology to the construction of the high-piled wharfs hydraulic engineering.

    参考文献
    相似文献
    引证文献
引用本文

胡 令. BIM技术在洋山四期水工码头中的应用[J].水运工程,2020(11):151-154.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2020-11-10
  • 出版日期:
文章二维码