Abstract:Combining two-year project management practices of construction of Abu Dhabi Khalifa Port Container Terminal Phase II Project,which is an important “the Belt and Road” project between China and the United Arab Emirates (UAE),and seizing the opportunity of working with the internationally famous consultant JACOBS for providing high-level consulting & project management services for the project,we study the project quality management methods from three aspects including pre-construction control,in-process management and post-construction summary,so as to provide reference for the domestic engineers to attend the overseas project management.The study mainly focuses on the overseas project quality management method which are obviously different from those in China.By the analysis and comparison method,we summarize the good material quality management method MAR and construction quality management method WIR which emphasizes the process control & record,and plan to introduce them to the domestic project quality management work in China later to help improve the domestic project quality management level.