大源渡二线船闸总体布置方案
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Overall layout plan of Dayuandu second-line ship lock
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为解决丘陵地区复杂地形条件下既有枢纽建筑对扩建二线船闸的制约影响,从理论上分析设计条件,并通过物理模型验证,提出适合弯曲河段的船闸总体布置方案和保障通航能力的技术措施。该船闸总体布置方案和相关技术措施可为湘江流域后续二线船闸建设提供借鉴。

    Abstract:

    In order to solve the constraints of existing hub buildings on the expansion of second-line ship locks under complex terrain conditions in hilly areas,this paper analyzes theoretically the design conditions,and proposes the overall layout plan of the ship lock suitable for the curved section and the technical measures to ensure the navigation capacity,which is verified by the physical model.The overall layout plan of the ship lock and related technical measures can provide reference for the construction of the second-line ship lock in the Xiangjiang River.

    参考文献
    相似文献
    引证文献
引用本文

周 灿,段元振,彭 哲,等.大源渡二线船闸总体布置方案[J].水运工程,2019(3):39-42.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2019-03-12
  • 出版日期:
文章二维码