    摘要:

    打桩施工过程会对周围建筑物及环境产生一定影响。对打桩施工的影响机理及沉桩过程模拟进行理论分析,并结合上海地区河道陆域范围内某新建厂房项目,运用孔穴扩张理论及动力有限元法,计算分析打桩施工对邻近河道的影响。动力有限元的计算结果表明,打桩施工对河道护岸影响较小,且与孔穴扩张理论的计算结论基本一致。同时提出预防和减轻打桩施工影响的设计、施工、监测措施,可为类似工程提供借鉴。

    Abstract:

    The construction process of pile driving has a certain influence on surrounding buildings and environment.We make a theoretical analysis on the influence mechanism of pile driving and the simulation of pile driving process.Through a new plant project within the river land area in Shanghai,we apply hole expansion theory and the dynamic finite element method to calculate and analyze the pile construction on the adjacent riverway.The calculation results of dynamic finite element method show that the impact of pile construction on river bank is small,and is the same as hole expansion theory results.Engineering measures to prevent and mitigate the impact of piling driving are also put forward,which can provide reference for similar projects.

    参考文献
    相似文献
    引证文献
引用本文

张杨杨,吴 丹,杭旭超.打桩施工对邻近河道的影响[J].水运工程,2019(2):181-184.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2019-01-30
  • 出版日期:
文章二维码