    摘要:

    在高桩码头设计中,桩基的选型和布置往往对结构方案具有较大影响。针对某工程高桩梁板式码头结构设计问题,对工程的水文地质情况、设计荷载等因素进行分析,在保证结构的安全性和可靠性的前提下,通过对两种不同桩基的选型和布置方案进行比选,确定适用于本工程的结构方案。结合本工程的实际情况,对推荐结构方案的施工要点进行经验性总结。

    Abstract:

    In the design of high-pile wharf,selection and arrangement of pile foundation impact on structure scheme significantly.For the structural design of high-piled beam-slab wharf in a project,we analyze the influence factors,such as hydrogeological conditions,designing load,etc.On the premise of security and reliability of the structure,we propose a recommended structure scheme by comparing two different selections and arrangements of pile foundation,and empirically summarize the construction points of recommended structure scheme according to the actual situation.

    参考文献
    相似文献
    引证文献
引用本文

金 苗,田 鑫.高桩码头结构方案比选及施工要点[J].水运工程,2018(S1):83-85.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2018-12-12
  • 出版日期:
文章二维码