Abstract:In order to solve the problem of fixed-point installation of accropodes in the Yangpu Port,this paper presents a fixed-point installation process of accropodes.Using the RTK system to make the plane coordinate of RTK mobile station coincide with accropodes and configuring tablet as location information interaction terminal,the process improves the installation accuracy and efficiency.Compared to the other process,the fixed-point installation process of accropodes with RTK system is more accurat and efficient,but lacks in installation interconnection.Fixed-point installation process of accropodes with RTK system is economical and feasible.