Abstract:In order to design drainage system more reasonably and simulate the storm process more accurately,we complete storm water system simulation of the SWMM method by software SSA based on Kribi port phase II project,and compare it with the rational method.The results show that SWMM method applied for storm water system simulation is reasonable,which provides job foundation for low impact development at port project in future.