三峡蓄水后长江中游沿程河道水位的预测方法*
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

国家重点研发计划项目(2016YFC0402105)


Water level prediction methodin the middle Yangtze River after water storage of the Three Gorges Dam
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    长江中游沿程江湖联通、水系复杂,且受三峡蓄水影响,坝下河道水沙条件发生剧变,导致航道水位预测较为困难。针对此问题,以长江中游实测资料为基础,充分考虑支流入汇和三峡蓄水后新水沙条件的影响,通过相关分析法,建立航道水位预测方法,并提出上、下荆江,城陵矶—汉口和汉口—湖口河段沿程水位的多元回归模型预测方法。经实测资料检验,绝对误差均在0.4 m以内,能较好地提高长江中游沿程河道水位预测精度。

    Abstract:

    There are many tributaries in the middle Yangtze River,and the water system is complex.As the result of water storage of the Three Gorges,water and sand conditions under the dam have changed violently.These factors cause the difficult of water level prediction.Based on the measured data of the middle Yangtze River,we consider the tributary remittance and new water and sand conditions,and put forward the correlational analysis method and multiple regression method to forecast the river water lever of upper and lower Jingjiang reach,Chenlingji-Hankou,Hankou-Hukou reach.The method is examined by the measured data,and the absolute error is less than 0.4 m.The method can improve the water lever prediction accuracy of the middle Yangtze River.

    参考文献
    相似文献
    引证文献
引用本文

熊 波.三峡蓄水后长江中游沿程河道水位的预测方法*[J].水运工程,2018(9):25-32.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2018-09-14
  • 出版日期:
文章二维码